Concept Pages

Saturday, May 10, 2014

Grain Elevator Modules              
_____________________________________________________________
     The 'easy' end has alignment pin holes drilled and track installed part way across the module.  Will get the 'hard' end drilled this evening and maybe the track down onto the end of the module  

Tuesday, May 6, 2014

Garden City CO-OP
_____________________________________________________________
   
Working on the other end of the grain elevator module set. This will be an 18ft
 long married set capable of handling two 20 car grain trains one inbound (empty)
 and one outbound (loaded). Anhydrous ammonia tanks will be located here as well to bring in nitrogen fertilizer by railcar   
More Module progress - These two modules are now fully operational                
_____________________________________________________________
   
A crossover to the 10 as well as a crossover between the 8 and the 10 

  
A standard 3 track in/out "Fisher #1" 
Scenery will be rails through the countryside for scenery.