Concept Pages

Thursday, November 17, 2011

Laying Track @ Griffin Jct

Coming along slow but sure. The wye is in.
#10R on the tail.
#6R on the East end of the Wye and a
#8L at the West end of the Wye.

Crossings at the double track mains will be handlaid.

After a practice run on a piece of scrap lauan I'll complete the crossings on the module.

Friday, October 28, 2011

Roadbed installation on Griffin Jct

Lauan roadbed installation has been completed on Griffin Jct.

Thursday, October 27, 2011

Basement Modular - Fall 2011 Iteration

I have been working on the development of the modular/permanent layout. Here's the latest iteration. The modules are pretty easy to see. Along the walls there is a two level shelf layout. The module rail height is 48". The two shelves are at 45" and 59" respectively. Access to the upper level is via the helix in the utility room at the upper right.
The interior of the loop will only be accessible via the wye when ops sessions are conducted and there will be no ability to go completely around the inside loop. The fiddle yard will be at the end of the lower shelf level and inside a closet below a set of stairs.

Tuesday, October 25, 2011

Saturday, September 24, 2011

Almost ready for the waffle bottom !

Just finished gluing in the middle ribs. Be ready for the waffle this evening ! Less than a week. Have 3 more of these to
Mike Sherbak
Aiken SC