Repaired Fisher 2 module. Added a couple of sidings and renamed the module “Brennan’s Woods”
Log Dump For the Sierra West Sawmill
10 months ago
Blog to chronicle my efforts in building Sipping and Switching Society of North Carolina waffle frame modules
Working on the other end of the grain elevator module set. This will be an 18ft
long married set capable of handling two 20 car grain trains one inbound (empty)
and one outbound (loaded). Anhydrous ammonia tanks will be located here as well to bring in nitrogen fertilizer by railcar
One end of a 3 module married set.
Includes a crossover on the mains - not that the mains are shifted
4" to the front edge
This allows for a bit more flexibility on the branchline scenery
but makes it a non-standard mainline module that is married to
the corresponding Grain elevator module that brings the mains back to the
standard 8"/10" location from the front edge of the module.
Alignment pins are cut in 4 quadrants and then the kerfs are closed up by bending the tabs that are formed by the cuts resulting in a tapered pin to ease assembly
Emery cloth and filing is required to deburr the pin and smooth the surfaces
Four holes in each end of the modules with the pins in the left hand holes of each pair of holes. When joined each modules is aligned with 4 pins making for a precise and rigid joint. Pin location is relative to the RAILHEAD'slocation so rails are brought to the edge of the module and are aligned to within thousandths of an inch
5 of 6 modules in progress in Garden City KS. Initial plans are to build eight 45deg 8ft outside curved modules and ten 6ft straight modules.
Crossings at the double track mains will be handlaid.
After a practice run on a piece of scrap lauan I'll complete the crossings on the module.