Concept Pages

Friday, May 1, 2020


Repaired Fisher 2 module. Added a couple of sidings and renamed the module “Brennan’s Woods”

Wednesday, September 30, 2015

More 2ft inside 90 module progress

This yet to be named module now has roadbed installed on the mainlines as well as the branchline. 

Brass screws are installed to solder the rails to. 
Next step is to drill alignment pin holes on each frontier. 

Michael Sherbak


--
Michael Sherbak

2ft inside 90 progress

Got the waffle painted and have started on roadbed installation. 
This module has the 8/10 mains to the inside at 32" and 34" radii curves and the branchline radius is 45"



--
Michael Sherbak

Monday, September 28, 2015

Gandy dancers are working today

One of two 4ft Outside 90 deg curves being finished up after years of delays. The outside radius of the module is 48" so the track radii are at 40", 38" and 31" 

--
Michael Sherbak

Wednesday, September 23, 2015

Speed-mo



I first wrote about this concept back in 2012 :

http://sandsofnc-module-building.blogspot.com/2012/06/speed-mo-modular-experiment.html

It is finally getting closer to reality.

Saturday, May 10, 2014

Grain Elevator Modules              
_____________________________________________________________
     The 'easy' end has alignment pin holes drilled and track installed part way across the module.  Will get the 'hard' end drilled this evening and maybe the track down onto the end of the module  

Tuesday, May 6, 2014

Garden City CO-OP
_____________________________________________________________
   
Working on the other end of the grain elevator module set. This will be an 18ft
 long married set capable of handling two 20 car grain trains one inbound (empty)
 and one outbound (loaded). Anhydrous ammonia tanks will be located here as well to bring in nitrogen fertilizer by railcar   
More Module progress - These two modules are now fully operational                
_____________________________________________________________
   
A crossover to the 10 as well as a crossover between the 8 and the 10 

  
A standard 3 track in/out "Fisher #1" 
Scenery will be rails through the countryside for scenery. 

Tuesday, April 29, 2014

Grain Elevator module -  
   
One end of a 3 module married set.
Includes a crossover on the mains - not that the mains are shifted 
4" to the front edge 
This allows for a bit more flexibility on the branchline scenery 
but makes it a non-standard mainline module that is married to 
the corresponding Grain elevator module that brings the mains back to the 
standard 8"/10" location from the front edge of the module.   

Thursday, February 13, 2014

Sent from my mobile. Enjoy.
_____________________________________________________________
   
Alignment pins are cut in 4 quadrants and then the kerfs are closed up by bending the tabs that are formed by the cuts resulting in a tapered pin to ease assembly 
Emery cloth and filing is required to deburr the pin and smooth the surfaces 

  

Four holes in each end of the modules with the pins in the left hand holes of each pair of holes. When joined each modules is aligned with 4 pins making for a precise and rigid joint. Pin location is relative to the RAILHEAD'slocation so rails are brought to the edge of the module and are aligned to within thousandths of an inch

Sent from my mobile. Enjoy.
_____________________________________________________________

           

Sent from my mobile. Enjoy.
_____________________________________________________________

           

Sent from my mobile. Enjoy.
_____________________________________________________________

   

Saturday, January 18, 2014

Update

This is an under construction shot of the 18ft straight module set 
that will become Garden City CO-OP. At this point nearly all the roadbed is down on the 3 modules. The two end modules are operational now (2015 update) 





Sunday, July 1, 2012

We be modulating ! Boy howdy !

Da modules ! Da modules !

Sharing a few pics from the weekend's activities indexed by the last 4 numbers on the file name.

1022 - an overhead shot of the space available to fill with modules - a former Masonic Lodge meeting room.

0529 - 45 deg 8ft OS curve # 6 - need to glue in four more pieces and it will be ready for the waffle bottom. 
A 45deg curved Speed-mo module can be seen in the upper right hand corner of this photo.

0418 - 45 deg 8ft OS curve # 5 - ready for the waffle bottom

0302 - 6ft Depressed center flat - on legs today - some cleanup to do in the trimming department
it's mate may be seen in the upper center of the overhead shot. Has a 45deg curved module top/bottom lying on top of it.

3427 - 45 deg 8ft OS curve # 4 - ready for the waffle bottom -- this one fully assembled in the RV !

Will get started this week on the last pair of 45deg curves required to complete the 360 degrees of curvature.

All for now

Mike the Modulist

Sunday, June 24, 2012

Speed-mo - a modular experiment

I am working on a Free-mo module which is an experiment Joe Balint, Jr - noted developer of the waffle-frame module - have been having conversations about.

Basically it is a Free-mo module that has been built as a waffle frame and has a track on the 15 location of the S&SSofNC template. So - it has four alignment pins and quick disconnects and will receive legs with casters to enable it's integration into a S&SSofNC layout . A removable 1 inch  thick adapter plate will be applied to each end to allow connection to a Free-mo layout as well.



The trackplan and layout dimensional sketches is what I've developed thus far

Friday, May 18, 2012

S&SS of Kansas modules

5 of 6 modules in progress in Garden City KS. Initial plans are to build eight 45deg 8ft outside curved modules and ten 6ft straight modules.

Thursday, November 17, 2011

Laying Track @ Griffin Jct

Coming along slow but sure. The wye is in.
#10R on the tail.
#6R on the East end of the Wye and a
#8L at the West end of the Wye.

Crossings at the double track mains will be handlaid.

After a practice run on a piece of scrap lauan I'll complete the crossings on the module.

Friday, October 28, 2011

Roadbed installation on Griffin Jct

Lauan roadbed installation has been completed on Griffin Jct.