Wednesday, September 23, 2015
Speed-mo
I first wrote about this concept back in 2012 :
http://sandsofnc-module-building.blogspot.com/2012/06/speed-mo-modular-experiment.html
It is finally getting closer to reality.
Saturday, May 10, 2014
Tuesday, May 6, 2014
Garden City CO-OP
_____________________________________________________________
_____________________________________________________________
Working on the other end of the grain elevator module set. This will be an 18ft
long married set capable of handling two 20 car grain trains one inbound (empty)
and one outbound (loaded). Anhydrous ammonia tanks will be located here as well to bring in nitrogen fertilizer by railcar
Tuesday, April 29, 2014
Grain Elevator module -
One end of a 3 module married set.
Includes a crossover on the mains - not that the mains are shifted
4" to the front edge
This allows for a bit more flexibility on the branchline scenery
but makes it a non-standard mainline module that is married to
the corresponding Grain elevator module that brings the mains back to the
standard 8"/10" location from the front edge of the module.
Thursday, February 13, 2014
Sent from my mobile. Enjoy.
_____________________________________________________________
_____________________________________________________________
Alignment pins are cut in 4 quadrants and then the kerfs are closed up by bending the tabs that are formed by the cuts resulting in a tapered pin to ease assembly
Emery cloth and filing is required to deburr the pin and smooth the surfaces
Four holes in each end of the modules with the pins in the left hand holes of each pair of holes. When joined each modules is aligned with 4 pins making for a precise and rigid joint. Pin location is relative to the RAILHEAD'slocation so rails are brought to the edge of the module and are aligned to within thousandths of an inch
Subscribe to:
Posts (Atom)












